The Catholic High Bleacher Addition project expanded the school’s athletic facilities with a 900-seat stadium, canopy, home locker room, coaches’ office, and a concession stand with restrooms. Using a design-assist approach, Arkel Constructors was involved early in the design phase, allowing for strategic project phasing that ensured home games could continue during construction while keeping fans and students safe. Through multiple design reviews, our preconstruction team identified alternative construction methods and materials that reduced costs without compromising quality. These savings allowed the owner to reinvest in additional stadium upgrades that were originally beyond the budget. By leveraging early collaboration, strategic phasing, and cost-saving solutions, Arkel helped deliver a stadium that exceeded the original scope while maintaining safety and game-day operations. This project showcased the value of proactive planning and teamwork in achieving both budget and performance goals.
Arkel Constructors works every day to deliver the highest and most comprehensive level of construction services to our clients. From the initial introduction to the project closeout, Arkel Constructors' commitment to our clients is what has enabled us to become a contractor of choice along the Gulf Coast. Click the Get in Touch button below to get started.
get in toucH